Life cycle analysis of batteries in maritime sector [2016]
The purpose of the report was to perform a life cycle assessment of batteries used in a maritime setting. Two cases were considered: a hybrid platform supply vessel (PSV) and a fully electric ferry. The report was prepared by the Maritime Battery Forum in cooperation with Grenland Energy, ABB, and DNV GL for the Norwegian NOx-fund.